-g broken
Hal Murray
hmurray at megapathdsl.net
Thu Mar 22 21:04:24 UTC 2018
Gary said:
>> Was there a successful jump in the log file?
> You tell me, below is all I have for one test cycle. I have many similar
> test cycles logs.
This looks like a successful big jump to me.
12-31T16:00:24 ntpd[1931]: PROTO: 0.0.0.0 c41c 0c clock_step
+902266367.623732 s
09-10T21:01:27 ntpd[1931]: CLOCK: time stepped by 902266367.623732
[Aside, the big jump stuff should log the full date. The year is missing
above.]
This looks interesting:
12-31T16:00:21 ntpd[1931]: SYNC: Found 12 servers, suggest minsane at least 3
Would you please try it with
tos minsane 3
in your config file.
(or pick a bigger number if you think most of them are reliable)
--
These are my opinions. I hate spam.
More information about the devel
mailing list